Throughout its history, Calvi Sainte-Catherine Airport has established itself firmly in the local area and become an integral part of the economy of the region it serves.
1945: The US Air Force built Calvi airfield on private land during the Second World War
1956: The State bought the aerodrome.
A temporary authorisation order was signed on 12 May, under which the Corsican EPCI became the airport’s operator.
1958: Construction of the first building with a control tower
Construction of the first building with a control tower
1973: Refurbishment of the terminal building
Terminal layout
1995: Extension of the terminal
Capacity of 500,000 passengers
2005: Further extension of the terminal building to accommodate checked-in luggage and security staff
2009: Certification of the runway and launch of the general and business aviation centre
2013: Aviation improvement works
2020: Creation of a business and general aviation car park
2023: Record traffic!
Record traffic for our platform, with 362,541 PASSENGERS
2023: Labelling and certification
Aérobio LEVEL 1 certification achieved.
This certification demonstrates the investment and commitment on the part of the Corsican Chamber of Commerce and Industry (CCI) and the airport teams to sustainable development and environmental protection
& Awarded ‘REDUCTION’ level certification, in recognition of the measures taken to reduce CO₂ emissions